Month Five: Construction and Installation of Handhole Covers. Application of Pavement Markings, scraping of old pedestrian lanes and pavement markings. Relocation of Drainage inlet at Starbucks side. Construction of Speed Tables at Camino Verde side. Installation of Traffic Lanterns and Detector Loop cables.