Month Two: Demolition of Concrete Barrier along Shaw Blvd. with roadway excavation. Installation of PE pipes and placing of gravel base for Pipelaying. Formworks for Reinforced Concrete Curb and Construction of Type B footing
.
Month Two: Demolition of Concrete Barrier along Shaw Blvd. with roadway excavation. Installation of PE pipes and placing of gravel base for Pipelaying. Formworks for Reinforced Concrete Curb and Construction of Type B footing
.